Home/Notes/Solar Parks in India: Complete List with Capacity, State and Operator (2026)
Solar Parks in India: Complete List with Capacity, State and Operator (2026)
📖 Study ArticleGeographySSC CGL

Solar Parks in India: Complete List with Capacity, State and Operator (2026)

By Published: 17 November 2026Exam: SSC CGL
#static-gk#geography#solar-power#renewable-energy#ssc-cgl#ibps-po#general-awareness#energy

Exam

SSC CGL

Subject

Geography

Reading time

16 min · 11 sections

Published

17 November 2026

On this page
  1. 1Solar Parks in India: Quick Answer
  2. 2Capacity Is Not Generation — Read the Units First
  3. 3The Complete List — Solar Parks and Major Plants
  4. 4How India Got to 171 GW
  5. 5Five Parks Worth Knowing in Detail
  6. 6Records and Firsts
  7. 7Common Mistakes
  8. 8Memory Tricks
  9. 9Practice Questions
  10. 10Frequently Asked Questions
  11. 11Practice Next

Solar Parks in India: Quick Answer

India's largest solar park is Bhadla Solar Park in Rajasthan, at 2,245 MW, and it was the world's largest photovoltaic park when completed. The second-largest is Pavagada (Shakti Sthala) in Karnataka, at 2,050 MW, followed by NP Kunta (Ananthapuramu) in Andhra Pradesh, at 1,400 MW, and Kurnool Ultra Mega Solar Park, also in Andhra Pradesh, at 1,000 MW. India's total installed solar capacity stood at 171.05 GW as of 30 September 2026, according to the Ministry of New and Renewable Energy (MNRE) — up from just 2.82 GW in March 2014, a rise of roughly sixty times in twelve and a half years. The next giant is already rising: the Khavda Renewable Energy Park in Gujarat is planned at 30 GW of solar plus wind, with about 9.4 GW of renewable capacity installed by Adani Green Energy there as of April 2026 (solar, wind and hybrid together — not solar alone).

🔥 Key Exam Takeaway: The top three in order are Bhadla 2,245 MW (Rajasthan) > Pavagada 2,050 MW (Karnataka) > NP Kunta 1,400 MW (Andhra Pradesh), then Kurnool and Kadapa, 1,000 MW each (Andhra Pradesh). Learn the state with the park — Bhadla-Rajasthan, Pavagada-Karnataka, NP Kunta/Kurnool/Kadapa-Andhra Pradesh, Rewa-Madhya Pradesh, Kamuthi-Tamil Nadu — because "which state" is asked as often as "how many MW". All figures on this page are as of 17 November 2026, and capacities are installed (operational) MW unless a row is marked "planned".

Capacity Is Not Generation — Read the Units First

The commonest mistake in this topic is also the easiest to make: confusing capacity (MW) with generation (units of electricity, usually million units or billion kWh a year). Capacity is the size of the plant — how much power it can produce at full sun. Generation is how much it actually produces, which depends on sunshine hours, dust, temperature and maintenance. A 2,245 MW park does not produce 2,245 MW all day; it produces near that only at midday in clear weather, and its annual output is measured in billions of units. If a question says "Bhadla generates 2,245 MW", it is mixing the two — the correct statement is that Bhadla has a capacity of 2,245 MW.

Two more distinctions matter. A solar park is a large tract of land with shared infrastructure (roads, transmission, water) where many developers build separate plants — Bhadla and Pavagada are parks. A solar plant is a single project by one developer — Kamuthi is a single 648 MW plant by Adani Green Energy, not a multi-developer park, though lists often group it with the parks. And planned capacity is not installed capacity: Khavda's 30 GW is a plan, with about 9.4 GW of renewable capacity installed by Adani Green Energy as of April 2026 — solar, wind and hybrid together, not solar alone. Never answer a "largest operational park" question with a planned figure.

The Complete List — Solar Parks and Major Plants

One table, ordered by installed capacity. "Planned" rows are marked and are not counted in the operational ranking.

#Solar Park / PlantStateCapacity (MW)Operator / DeveloperStatus / Note
1Bhadla Solar ParkRajasthan2,245Rajasthan Solar Park Development Co. (RSPCL/RSDCL)Operational; world's largest PV park at completion; four phases, 2015–2020
2Pavagada Solar Park (Shakti Sthala)Karnataka2,050Karnataka Solar Power Development Corp. (KSPDCL)Operational; farmer land-lease model; fully commissioned 2019
3NP Kunta (Ananthapuramu Ultra Mega Solar Park)Andhra Pradesh1,400APSPCLOperational; total park capacity 1,500 MW (balance 100 MW cancelled by MNRE)
4Kurnool Ultra Mega Solar ParkAndhra Pradesh1,000Andhra Pradesh Solar Power Corp. (APSPCL)Operational; briefly the world's largest single site (2017)
5Kadapa Ultra Mega Solar ParkAndhra Pradesh1,000APSPCL (NTPC 250 MW + SECI 750 MW)Fully commissioned; 1,000 MW operational
6Rewa Ultra Mega Solar ParkMadhya Pradesh750Rewa Ultra Mega Solar Ltd (RUMSL)Operational since 2018; supplies Delhi Metro; record-low tariff ₹2.97/unit at the time
7Charanka Solar ParkGujarat~730Gujarat Power Corp. (GPCL)Operational; India's first mega-solar park model (2012–2015); about 500 MW in the first phases, later expansions to ~730 MW
8Kamuthi Solar Power ProjectTamil Nadu648Adani Green EnergyOperational since September 2016; single plant, built in 8 months
9Ananthapuramu–II Solar ParkAndhra Pradesh400APSPCLOperational; planned capacity 500 MW
10Dholera Solar Park (Phase I)Gujarat~300Gujarat Power Corp. (GPCL)Partly operational; Phase I is 1,000 MW sanctioned, ~300 MW commissioned (Tata Power, Apr 2022), ~700 MW under development targeted Mar 2027; 5,000 MW approved in total
—Khavda Renewable Energy ParkGujarat30,000 plannedAdani Green Energy, NTPC Green Energy, GIPCLUnder construction; 30 GW solar + wind target by 2029; will be the world's largest hybrid RE park; ~9.4 GW of renewable capacity installed by AGEL as of Apr 2026 (solar + wind + hybrid, not solar alone); 5,960 MW running across the three Solar Park Scheme parks at Khavda (CEA, Sep 2026)
—Fatehgarh Solar Park (Phase-IB)Rajasthan1,500 planned (1,234 MW running)Adani-Rajasthan JV (AREPRL) and other developersUnder development; 1,234 MW running, 266 MW under construction (CEA, Sep 2026)
—Omkareshwar Floating Solar ParkMadhya Pradesh600 planned (278 MW running)RUMSLFloating solar on the Narmada reservoir; 278 MW already running (NHDC 88 + Amp Energy 100 + SJVN 90 MW), 322 MW still to be awarded (CEA, Sep 2026)
—Pugal Solar ParkRajasthan2,450 plannedRSDCLPlanned, with large battery storage; commissioning targeted 2028

The arithmetic of the top five fully operational parks is worth doing once: 2,245 + 2,050 + 1,400 + 1,000 + 1,000 = 7,695 MW. The top two parks alone (4,295 MW) are more than five and a half times Rewa's 750 MW (4,295 ÷ 750 ≈ 5.7×), and the top five together are more than ten times Rewa (7,695 ÷ 750 ≈ 10.3×), which shows how concentrated India's solar capacity is in Rajasthan, Karnataka and Andhra Pradesh. Rajasthan leads the states by a wide margin — Bhadla plus Fatehgarh and Pugal in the pipeline — while Andhra Pradesh has four parks in the top ten (Kurnool, NP Kunta, Kadapa and Ananthapuramu–II), which is why "which state has the most solar parks in the top ten" is a trickier question than "which state has the largest park".

How India Got to 171 GW

The growth is the story examiners increasingly ask about, not just the park names. In March 2014, India's installed solar capacity was 2.82 GW. By 30 September 2026 it was 171.05 GW — 125.65 GW of ground-mounted plants, 33.41 GW of grid-connected rooftop, 5.36 GW in wind–solar hybrids and 6.63 GW of off-grid systems (MNRE, 30 September 2026). In 2025–26 alone, 44.61 GW was added, the highest ever in a single year. Total non-fossil capacity stood at 308.03 GW against the 2030 target of 500 GW of non-fossil capacity announced at COP26.

The policy spine is the solar park scheme launched by MNRE in December 2014, which funds shared infrastructure for parks of 500 MW and above; its target was raised from 20,000 MW to 40,000 MW in 2017. Under it, 56 parks with 39,461 MW have been sanctioned in 14 states, and 18,919 MW of projects had been commissioned inside them (Lok Sabha reply). The scheme is why the park list above exists at all: without shared transmission and land, developers could not have built at gigawatt scale in the desert districts of Rajasthan and the dry plains of Karnataka and Andhra Pradesh.

Five Parks Worth Knowing in Detail

By size alone the top five fully operational parks are Bhadla, Pavagada, NP Kunta, Kurnool and Kadapa (see the table). The five profiled below are the five most-asked in exams — Rewa and Kamuthi earn their places on tariff and speed, not size.

Bhadla (Rajasthan, 2,245 MW). In Phalodi district (formerly Jodhpur district), in the Thar Desert, across about 5,700 hectares in four phases between 2015 and 2020, developed by the Rajasthan Solar Park Development Company. The standard exam answer for "largest solar park in India" and "largest solar park in the world" at completion.

Pavagada (Karnataka, 2,050 MW). In Tumakuru district, also called the Shakti Sthala Solar Power Project, developed by KSPDCL and fully commissioned in 2019. Its distinctive feature is the land model: farmers lease their land to developers and keep receiving rent instead of selling it.

Kurnool (Andhra Pradesh, 1,000 MW). Developed by APSPCL, commissioned in 2017 with about 4 million panels over roughly 2,400 hectares. It was briefly the world's largest single-site solar plant. The exam hook is the round number: exactly 1,000 MW.

Rewa (Madhya Pradesh, 750 MW). Developed by RUMSL and commissioned in July 2018. Its fame is not size but price and buyer: it supplied power to the Delhi Metro — the first metro in India to run partly on solar — at a then-record tariff of ₹2.97 per unit, and it is cited by the World Bank as a global best practice.

Kamuthi (Tamil Nadu, 648 MW). A single plant by Adani Green Energy at Kamuthi, Ramanathapuram district, completed on 21 September 2016 in just 8 months, with robotic cleaning. The exam hook is the builder and the speed: the largest single-location plant built by one developer in one push.

Records and Firsts

  • Largest solar park in India (operational): Bhadla, Rajasthan, 2,245 MW.
  • Second-largest: Pavagada, Karnataka, 2,050 MW.
  • First mega-solar park in India: Charanka, Gujarat (2012–2015), the model for the later parks.
  • Largest single-location solar plant by one developer: Kamuthi, Tamil Nadu, 648 MW, built in 8 months.
  • First metro powered partly by solar: Delhi Metro, supplied by Rewa (2018).
  • Largest planned renewable park in the world: Khavda, Gujarat — 30 GW solar + wind, about 9.4 GW of renewable capacity installed by AGEL as of April 2026, full completion targeted 2029.
  • India's installed solar capacity: 171.05 GW as of 30 September 2026 (MNRE), up from 2.82 GW in March 2014.
  • Highest single-year addition: 44.61 GW in 2025–26 (MNRE).
  • 2030 target: 500 GW of non-fossil capacity, of which 308.03 GW was in place as of 30 September 2026.

Common Mistakes

  1. Answering Bhadla with 2,050 MW. That is Pavagada. Bhadla is 2,245 MW; Pavagada is 2,050 MW. The gap is 195 MW — learn both numbers, not just the order.
  2. Calling Khavda the largest operational park. Khavda's 30 GW is planned; about 9.4 GW of renewable capacity (solar, wind and hybrid together, not solar alone) had been installed by AGEL as of April 2026. The largest operational park is still Bhadla.
  3. Putting Pavagada in Andhra Pradesh. Pavagada is in Karnataka (Tumakuru district). Kurnool, NP Kunta and Kadapa are the Andhra Pradesh parks.
  4. Putting Rewa in Rajasthan. Rewa is in Madhya Pradesh. Its developer, RUMSL, is a Madhya Pradesh–Government of India joint venture, and its famous buyer is the Delhi Metro.
  5. Confusing capacity (MW) with generation (units). A park's MW figure is its size, not its annual output. Never write "Bhadla generates 2,245 MW".
  6. Calling Kamuthi a solar park. Kamuthi is a single 648 MW plant by Adani Green Energy. Bhadla and Pavagada are multi-developer parks.
  7. Saying India has 171 GW of solar parks. 171.05 GW is total installed solar capacity — ground-mounted, rooftop, hybrid and off-grid together. The parks are only the ground-mounted part of it.
  8. Dating the solar park scheme to 2017. The scheme launched in December 2014; 2017 is when its target was raised from 20,000 MW to 40,000 MW.
  9. Mixing up Charanka's capacity. Charanka is quoted at 500 MW (first phases), about 615 MW and about 730 MW in different sources, because it grew in phases. The safe figure is "about 500 MW in the first phases, about 730 MW after later expansions".
  10. Forgetting that Rewa's record was its tariff, not its size. At 750 MW Rewa is only the sixth-largest in this list; its fame is the ₹2.97-per-unit tariff and the Delhi Metro supply.

Memory Tricks

  • "2-2-1" for the top three: Bhadla 2,245, Pavagada 2,050, NP Kunta 1,400 — two two-thousands, then fourteen hundred.
  • States of the five most-asked parks: Rajasthan, Karnataka, Andhra Pradesh, Madhya Pradesh, Tamil Nadu — "R-K-A-M-T, the parks run down the map from the Thar to the tip".
  • Rewa = Rail: Rewa supplies the Delhi Metro — link the park's name to the railway it powers, and its tariff ₹2.97 to the year 2018 (nearly ₹3, nearly 2018's record).
  • Kamuthi = 648, built in 8 months: 648 ends in 8, and it took 8 months. One digit remembers both facts.
  • Pavagada = farmers lease: the park where farmers kept their land and took rent — "Pavagada pays the farmer".

Practice Questions

Q1. Which is the largest solar park in India, and what is its capacity? A: Bhadla Solar Park, Rajasthan, 2,245 MW.

Q2. Which is the second-largest solar park in India, and in which state is it? A: Pavagada (Shakti Sthala), Karnataka, 2,050 MW, in Tumakuru district.

Q3. Which solar park supplies power to the Delhi Metro, and what was special about its tariff? A: Rewa Ultra Mega Solar Park, Madhya Pradesh, 750 MW. Its tariff of ₹2.97 per unit was a record low when it was signed, and the project won a World Bank President's Award.

Q4. What is India's total installed solar capacity as of 30 September 2026? A: 171.05 GW (MNRE) — 125.65 GW ground-mounted, 33.41 GW rooftop, 5.36 GW hybrid and 6.63 GW off-grid. In March 2014 it was only 2.82 GW.

Q5. Which is the largest single-location solar plant built by one developer, and how long did it take to build? A: Kamuthi Solar Power Project, Tamil Nadu, 648 MW, built by Adani Green Energy in 8 months and completed in September 2016.

Q6. What is the Khavda Renewable Energy Park's planned capacity, and how much renewable capacity had been installed there as of April 2026? A: 30 GW of solar plus wind, planned for completion by 2029; about 9.4 GW of renewable capacity (solar, wind and hybrid) had been installed by Adani Green Energy as of April 2026. It is a hybrid park, not yet the largest operational park.

Q7. Which was India's first mega-solar park? A: Charanka Solar Park, Gujarat, developed from 2012–2015 by the Gujarat Power Corporation — about 500 MW in its first phases.

Q8. What is the difference between a solar park and a solar plant? A: A solar park is a large site with shared infrastructure where many developers build separate plants (Bhadla, Pavagada). A solar plant is a single project by one developer (Kamuthi). A park's capacity is the sum of its plants.

Q9. Kurnool Ultra Mega Solar Park is in which state and has what capacity? A: Andhra Pradesh, 1,000 MW. It was briefly the world's largest single-site solar plant when commissioned in 2017.

Q10. What is India's 2030 non-fossil capacity target, and how far along was it as of 30 September 2026? A: 500 GW of non-fossil capacity by 2030; 308.03 GW was in place as of 30 September 2026, leaving about 192 GW to be added.

Frequently Asked Questions

Q1. What is the largest solar park in India? Bhadla Solar Park in Rajasthan, at 2,245 MW. It was the world's largest photovoltaic park when completed. Pavagada in Karnataka (2,050 MW) is second.

Q2. Is Khavda bigger than Bhadla? Not yet. Khavda's planned capacity is 30 GW of solar plus wind, which would make it the world's largest hybrid renewable park, but only about 9.4 GW of renewable capacity had been installed by AGEL as of April 2026. Bhadla remains the largest operational park.

Q3. Which state has the largest solar park, and which state has the most parks in the top ten? Rajasthan has the largest (Bhadla, 2,245 MW). Andhra Pradesh has the most parks in the top ten of this list — Kurnool, NP Kunta, Ananthapuramu–II and Kadapa.

Q4. What is the difference between MW and units of electricity? MW (megawatts) measures capacity — the size of the plant. Units (kWh) measure generation — how much electricity it actually produces over time. A 2,245 MW park never produces 2,245 MW around the clock.

Q5. When did India's solar park scheme start? December 2014, launched by MNRE. Its target was raised from 20,000 MW to 40,000 MW in 2017. Under it, 56 parks totalling 39,461 MW have been sanctioned in 14 states.

Q6. Why is Rewa famous if it is only 750 MW? Because of its tariff and its buyer: ₹2.97 per unit, a record low in 2018, supplying the Delhi Metro — the first metro in India to run partly on solar power.

Q7. How much solar capacity did India add in 2025–26? 44.61 GW, the highest ever in a single year (MNRE), taking total installed solar capacity to 171.05 GW by 30 September 2026.

Practice Next

Sources: MNRE state-wise installed-capacity table as on 30 September 2026 (total solar 171,051.46 MW; 125.65 GW ground-mounted, 33.41 GW rooftop, 5.36 GW hybrid, 6.63 GW off-grid; 2.82 GW in March 2014; 44.61 GW added in 2025–26; non-fossil 308.03 GW); Bhadla 2,245 MW, Pavagada 2,050 MW, Kurnool 1,000 MW, Rewa 750 MW and Kamuthi 648 MW cross-checked across multiple 2025–2026 compilations (Taypro, Chegg India, Vedantu, Bluebird Solar) and the LotusArise UPSC solar-energy note (Khavda 30 GW by 2029, ~9.4 GW by April 2026; Charanka 500 MW planned; Kamuthi completed 21 September 2016); solar-park scheme figures (56 parks, 39,461 MW sanctioned, 18,919 MW commissioned) per the Lok Sabha reply as reported in October 2026; NP Kunta 1,400 MW running / 1,500 MW park, Kadapa 1,000 MW fully commissioned (NTPC 250 MW + SECI 750 MW), Dholera Phase I 1,000 MW sanctioned with ~300 MW commissioned, Fatehgarh Phase-IB 1,500 MW with 1,234 MW running, Omkareshwar 278 MW running of 600 MW planned, and the three Khavda scheme parks totalling 5,960 MW running, all per the CEA 'Status Report on Development of Solar Parks/UMREPPs', September 2026 (via its park-by-park compilation); Khavda AGEL 9.4 GW total renewable capacity as of April 2026 per AGEL. Charanka ~730 MW per Wikipedia (Mar 2022). Charanka's capacity varies by source and is stated as a range in the text. As of 17 November 2026.

Test Your Knowledge

Take a free mock test for SSC CGL right now.

Take Free Mock Test →

Quick Information

Subject

Geography

Target Exam

SSC CGL

Access

Free

Save For Later

Bookmark this note to find it quickly from your dashboard.

Get Exam Alerts

Get daily exam study PDFs, notes & mock test updates on Telegram.

Join Free Telegram