Hydroelectric Power Plants in India: Quick Answer
India's largest completed hydroelectric plant is the Koyna Hydroelectric Project in Maharashtra, at 1,960 MW, on the Koyna river. Next come Srisailam (1,670 MW, Krishna river, Telangana/Andhra Pradesh), Nathpa Jhakri (1,500 MW, Sutlej, Himachal Pradesh), Sardar Sarovar (1,450 MW, Narmada, Gujarat) and Bhakra Nangal (1,325 MW, Sutlej, Himachal Pradesh/Punjab). The Tehri Dam in Uttarakhand — on the Bhagirathi — has a powerhouse of 1,000 MW and is India's tallest dam at 260.5 metres; the full Tehri complex (dam + 1,000 MW pumped storage + 400 MW Koteshwar) totals 2,400 MW, complete since April 2026, which is why some lists call Tehri the largest — the careful answer is that Koyna is the largest completed single plant and Tehri is the tallest dam. Large hydro stood at 52,065 MW on 30 September 2026 — about 9.3% of India's total installed capacity of 558,896 MW (Central Electricity Authority).
🔥 Key Exam Takeaway: The order to learn is Koyna 1,960 > Srisailam 1,670 > Nathpa Jhakri 1,500 > Sardar Sarovar 1,450 > Bhakra 1,325 > Tehri Dam 1,000 MW. Pair each plant with its river — Koyna–Koyna, Srisailam–Krishna, Nathpa Jhakri–Sutlej, Sardar Sarovar–Narmada, Bhakra–Sutlej, Tehri–Bhagirathi — because "which river" is asked as often as "how many MW". Capacities are installed MW as of 17 November 2026; Tehri figures differ between sources because the 1,000 MW dam, the 1,000 MW pumped-storage plant and the 400 MW Koteshwar are often mixed up — this note says which figure is which. The pumped-storage plant was fully commissioned in April 2026.
The Complete List — Hydroelectric Power Plants in India
One table, ordered by installed capacity. The two marked rows are not counted in the operational ranking — Subansiri Lower is partly commissioned (1,250 MW operational since October 2026; the remaining 750 MW under construction), and the Tehri Pumped Storage Plant is pumped-storage capacity (fully commissioned April 2026).
| # | Plant | River | State | Capacity (MW) | Operator |
|---|---|---|---|---|---|
| 1 | Koyna Hydroelectric Project | Koyna | Maharashtra | 1,960 | MAHAGENCO (Maharashtra State Power Generation Co.) |
| 2 | Srisailam | Krishna | Telangana / Andhra Pradesh | 1,670 | TSGENCO / APGENCO |
| 3 | Nathpa Jhakri | Sutlej | Himachal Pradesh | 1,500 | SJVN |
| 4 | Sardar Sarovar | Narmada | Gujarat | 1,450 | Sardar Sarovar Narmada Nigam Ltd (SSNNL) |
| 5 | Bhakra Nangal | Sutlej | Himachal Pradesh / Punjab | 1,325 | Bhakra Beas Management Board (BBMB) |
| 6 | Sharavathi | Sharavathi | Karnataka | 1,035 | KPCL (Karnataka Power Corp.) |
| 7 | Tehri Dam | Bhagirathi | Uttarakhand | 1,000 | THDC India Ltd |
| 8 | Indira Sagar | Narmada | Madhya Pradesh | 1,000 | NHDC (Narmada Hydroelectric Development Corp.) |
| 9 | Karcham Wangtoo | Sutlej | Himachal Pradesh | 1,000 | JSW Energy |
| 10 | Dehar | Beas | Himachal Pradesh | 990 | BBMB |
| 11 | Nagarjuna Sagar | Krishna | Telangana / Andhra Pradesh | 816 | TSGENCO / APGENCO |
| 12 | Chamera-I | Ravi | Himachal Pradesh | 540 | NHPC |
| 13 | Rampur | Sutlej | Himachal Pradesh | 412 | SJVN |
| 14 | Pong | Beas | Himachal Pradesh | 396 | BBMB |
| 15 | Hirakud (I & II) | Mahanadi | Odisha | 347.5 | OHPC (Odisha Hydro Power Corp.) |
| 16 | Chamera-II | Ravi | Himachal Pradesh | 300 | NHPC |
| — | Tehri Pumped Storage Plant | Bhagirathi | Uttarakhand | 1,000 (fully commissioned Apr 2026) | THDC India Ltd |
| — | Subansiri Lower | Subansiri | Arunachal Pradesh / Assam | 2,000 (partly commissioned — 1,250 MW operational, 750 MW under construction) | NHPC |
The arithmetic of the top six is worth doing once: 1,960 + 1,670 + 1,500 + 1,450 + 1,325 + 1,000 = 8,905 MW. The top two alone (Koyna + Srisailam = 3,630 MW) are more than two and a half times Bhakra's 1,325 MW (3,630 ÷ 1,325 ≈ 2.74×), and the six largest together are nearly nine times Tehri Dam's 1,000 MW. Three rivers dominate the list — the Sutlej (Nathpa Jhakri, Bhakra, Karcham Wangtoo, Rampur: 1,500 + 1,325 + 1,000 + 412 = 4,237 MW across four plants), the Krishna (Srisailam + Nagarjuna Sagar = 2,486 MW) and the Narmada (Sardar Sarovar + Indira Sagar = 2,450 MW). Himachal Pradesh has the most plants in the top 16 — seven (Nathpa Jhakri, Bhakra, Dehar, Chamera-I, Rampur, Pong, Chamera-II) — which is why "which state has the most hydro plants" and "which state has the largest hydro capacity" have different answers: Himachal Pradesh leads on count, Maharashtra leads on a single plant.
Tehri and Koyna — The Two Plants Examiners Ask About Most
Tehri (Uttarakhand, Bhagirathi, 1,000 MW). The Tehri Dam is 260.5 metres high — the tallest dam in India and one of the tallest in the world — and its powerhouse is 1,000 MW (4 × 250 MW). The confusion in the lists comes from the complex: the Tehri Hydroelectric Complex adds the 1,000 MW Tehri Pumped Storage Plant (4 × 250 MW — Unit 1 on 7 June 2025, Unit 2 on 10 July 2025, Unit 3 on 12 December 2025 and Unit 4 on 12 April 2026, when the plant was fully commissioned) and the 400 MW Koteshwar Dam downstream, for a complex total of 2,400 MW. So "Tehri 1,000 MW" (the dam), "Tehri 2,400 MW" (the complex) and "Tehri is the largest" (the complex, complete since April 2026) are all in circulation — and all three are true of different things. The exam-safe answers are: tallest dam in India — Tehri; Tehri Dam powerhouse — 1,000 MW; largest completed hydro plant — Koyna, 1,960 MW. THDC India Ltd operates the project; NTPC took over THDC's management control in 2019–20.
Koyna (Maharashtra, Koyna river, 1,960 MW). The largest completed hydroelectric plant in India, built in four stages (Stage I & II 600 MW, Stage III 320 MW, Stage IV 1,000 MW) plus a 40 MW dam-foot powerhouse — 600 + 320 + 1,000 + 40 = 1,960 MW. It sits in Satara district near Patan, in the seismically active Koyna region — the Koyna earthquake of 10 December 1967 (magnitude 6.6) struck the dam area after the reservoir was filled, and the dam survived; the event is a standard exam fact linking the plant to the earthquake. The project is run by MAHAGENCO, and its water comes from the Shivasagar (Koyna) reservoir, formed by the Koyna Dam on a tributary of the Krishna. Koyna is also the answer to "Maharashtra's largest hydro plant" — no other plant in the state comes close.
The Other Four in the Top Six
Srisailam (1,670 MW, Krishna, Telangana/Andhra Pradesh). The second-largest plant, on the Krishna at the Srisailam Dam — the left-bank powerhouse (6 × 150 MW = 900 MW, Telangana) plus the right-bank powerhouse (7 × 110 MW = 770 MW, Andhra Pradesh), 900 + 770 = 1,670 MW — with TSGENCO and APGENCO each operating units, which is why the state column reads "Telangana / Andhra Pradesh". Its reservoir is the second-largest in India by capacity, and it sits inside the Nagarjunasagar–Srisailam Tiger Reserve — the largest tiger reserve in India.
Nathpa Jhakri (1,500 MW, Sutlej, Himachal Pradesh). India's largest underground hydroelectric power plant — its 6 × 250 MW powerhouse is underground at Jhakri, fed by a dam at Nathpa. Operated by SJVN (Satluj Jal Vidyut Nigam), it is the standard answer for "largest underground powerhouse" and for "Sutlej's largest plant". Some older lists print 1,530 MW; the SJVN/NHPC figure is 1,500 MW, and this note uses 1,500 MW.
Sardar Sarovar (1,450 MW, Narmada, Gujarat). The dam is 163 metres high and 1,210 metres long — India's largest dam by volume of concrete — with two powerhouses: a 1,200 MW river-bed powerhouse (6 × 200 MW) and a 250 MW canal-head powerhouse (5 × 50 MW), totalling 1,450 MW. It is the terminal dam of the Narmada Valley project, benefits Gujarat, Madhya Pradesh, Maharashtra and Rajasthan, and was the subject of the Narmada Bachao Andolan; it was finally dedicated in September 2017. The Statue of Unity stands about 3 km downstream.
Bhakra Nangal (1,325 MW, Sutlej, Himachal Pradesh/Punjab). The Bhakra Dam is 226 metres high — the second-tallest in India after Tehri — and its Gobind Sagar reservoir was once the largest man-made lake in India. Jawaharlal Nehru called it the "temple of modern India". The Bhakra and Nangal powerhouses together give 1,325 MW, operated by the BBMB. Note the spelling trap: the river is the Sutlej (also spelt Satluj), and the dam sits on the Himachal–Punjab border — papers list the state as either, so "Himachal Pradesh / Punjab" is the safe answer.
Hydro's Share of India's Power
Hydro is a shrinking share of a fast-growing total, and that trend is itself an exam fact. On 30 September 2026, the Central Electricity Authority put India's total installed capacity at 558,896 MW: thermal 250,870 MW (about 44.9%), large hydro 52,065 MW (about 9.3%), nuclear 8,780 MW (about 1.6%) and renewables other than large hydro 247,182 MW (about 44.2%). In the 1960s hydro was over 50% of capacity; by 31 March 2020 it was 46,000 MW, or 12.3%; today it is about 9.3% — the fall reflects the rush of solar and thermal capacity, not a fall in hydro itself, which has grown in absolute terms from 0.6 GW in 1950–51 to 52 GW today. India ranks 5th in the world for installed hydro capacity. Small hydro (up to 25 MW) adds another 5,182 MW, counted under renewables. For the thermal and nuclear sides of the same picture, see the house lists linked below — this note does not re-state their tables.
Two structural facts complete the picture. First, pumped storage is hydro's new growth story: India had about 7.43 GW of operational pumped-storage capacity across 10 projects as of August 2026, and the Tehri PSP's 1,000 MW was fully commissioned in April 2026; the largest near-term addition still in the pipeline is the remaining 750 MW of the Subansiri Lower project (2,000 MW total; Units 1–5, 1,250 MW, operational since October 2026; full commissioning scheduled for Q1 FY2027-28). Second, the geography of potential is northern: the CEA's reassessment puts India's exploitable hydro potential at about 133,410 MW (schemes above 25 MW), concentrated in the Himalayan river systems of the north and north-east — which is why the next generation of big plants (Subansiri, Dibang) is coming from Arunachal Pradesh, not from the peninsular rivers that host the current top six.
Records and Firsts
- Largest completed hydro plant in India: Koyna, Maharashtra, 1,960 MW.
- Largest hydro complex: Tehri complex, 2,400 MW (dam 1,000 + pumped storage 1,000 + Koteshwar 400), complete since April 2026.
- Tallest dam in India: Tehri Dam, 260.5 metres (Bhagirathi, Uttarakhand).
- Second-tallest dam: Bhakra Dam, 226 metres (Sutlej).
- Largest underground powerhouse in India: Nathpa Jhakri, Himachal Pradesh (1,500 MW).
- Largest dam by volume of concrete in India: Sardar Sarovar, Gujarat.
- Oldest of the big six: Bhakra Nangal — the Bhakra Dam was completed in 1963; Koyna's first stage began generation in 1963–64, and the project was approved in 1953.
- State with the most plants in the top 16: Himachal Pradesh, with seven.
- River with the most capacity in the top 16: the Sutlej — 4,237 MW across four plants (Nathpa Jhakri 1,500 + Bhakra 1,325 + Karcham Wangtoo 1,000 + Rampur 412).
- India's world rank in installed hydro capacity: 5th.
- Largest under-construction hydro project: Subansiri Lower, 2,000 MW total (Arunachal Pradesh/Assam, NHPC) — 1,250 MW already operational, 750 MW still under construction.
Common Mistakes
- Answering "Tehri 1,000 MW" as the largest hydro plant. Tehri Dam's powerhouse is 1,000 MW; the largest completed plant is Koyna at 1,960 MW. Tehri's 2,400 MW is the whole complex including pumped storage and Koteshwar — the pumped-storage plant was fully commissioned in April 2026.
- Calling Tehri the tallest dam and the largest plant in the same breath. Tehri is the tallest dam (260.5 m). Koyna is the largest completed plant (1,960 MW). Two different records, two different plants.
- Putting Nathpa Jhakri at 1,530 MW. Some lists print 1,530 MW; the SJVN figure is 1,500 MW (6 × 250 MW). Use 1,500 MW.
- Putting Srisailam wholly in one state. It is shared between Telangana and Andhra Pradesh after bifurcation — left bank Telangana, right bank Andhra Pradesh. A single-state answer is wrong.
- Putting Bhakra in Punjab only. The dam is on the Himachal Pradesh–Punjab border; the safe answer is "Himachal Pradesh / Punjab".
- Confusing capacity (MW) with generation (units). A plant's MW figure is its size, not its annual output. Never write "Koyna generates 1,960 MW".
- Saying hydro is half of India's capacity. It was over 50% in the 1960s; today large hydro is about 9.3% of 558,896 MW (30 September 2026, CEA). Thermal is about 44.9%.
- Counting pumped storage as ordinary hydro generation. Pumped storage (like Tehri PSP) stores energy by pumping water uphill — it is a battery, not a new source of water. The Tehri PSP's 1,000 MW is storage capacity.
- Mixing up Koyna's river. Koyna is on the Koyna river, a tributary of the Krishna — not on the Krishna itself.
- Dating the Sardar Sarovar project to 2017 only. The dam was dedicated in 2017, but the project was conceived in the 1960s and construction ran for decades amid the Narmada Bachao Andolan. 2017 is the dedication, not the start.
Memory Tricks
- "K-S-N-S-B-T" for the top six: Koyna 1,960, Srisailam 1,670, Nathpa Jhakri 1,500, Sardar Sarovar 1,450, Bhakra 1,325, Tehri 1,000 — the capacities fall by roughly 300, 170, 50, 125, 325. Learn the sequence, not six separate numbers.
- Tehri = tallest, Koyna = biggest: one word each. Tallest dam — Tehri (260.5 m). Biggest completed plant — Koyna (1,960 MW).
- Sutlej carries four: Nathpa Jhakri, Bhakra, Karcham Wangtoo, Rampur — all on the Sutlej, all in Himachal Pradesh. "Sutlej = HP's river".
- Krishna carries two: Srisailam (1,670) and Nagarjuna Sagar (816) — both shared by Telangana and Andhra Pradesh.
- 1,960 = 600 + 320 + 1,000 + 40: Koyna's four stages add up to its total — Stage I & II 600, Stage III 320, Stage IV 1,000, dam-foot 40.
- Sardar Sarovar = 1,200 + 250: river-bed powerhouse 1,200 MW plus canal-head 250 MW = 1,450 MW.
Practice Questions
Q1. Which is the largest completed hydroelectric power plant in India, and what is its capacity? A: Koyna Hydroelectric Project, Maharashtra, 1,960 MW, on the Koyna river.
Q2. Which is the tallest dam in India, and how high is it? A: Tehri Dam, Uttarakhand, 260.5 metres high, on the Bhagirathi. Its powerhouse is 1,000 MW; the full Tehri complex totals 2,400 MW.
Q3. Name the second-largest hydro plant in India, its river and its capacity. A: Srisailam, on the Krishna river (Telangana/Andhra Pradesh), 1,670 MW — left bank 900 MW plus right bank 770 MW.
Q4. Which plant is India's largest underground hydroelectric power plant? A: Nathpa Jhakri, Himachal Pradesh — 1,500 MW (6 × 250 MW) on the Sutlej, operated by SJVN.
Q5. What is the installed capacity of the Sardar Sarovar project, and how is it split? A: 1,450 MW — a 1,200 MW river-bed powerhouse plus a 250 MW canal-head powerhouse, on the Narmada in Gujarat.
Q6. What is the capacity of Bhakra Nangal, and on which river and border does it stand? A: 1,325 MW, on the Sutlej, on the Himachal Pradesh–Punjab border. The Bhakra Dam is 226 metres high.
Q7. What share of India's total installed capacity was large hydro on 30 September 2026? A: 52,065 MW out of 558,896 MW — about 9.3% (CEA). Thermal was about 44.9% and nuclear about 1.6%.
Q8. Which river has the most hydro capacity among the plants in the top 16, and how much? A: The Sutlej — 4,237 MW across four plants: Nathpa Jhakri 1,500 + Bhakra 1,325 + Karcham Wangtoo 1,000 + Rampur 412 MW.
Q9. Which is the largest under-construction hydro project in India? A: Subansiri Lower, 2,000 MW total (8 × 250 MW), on the Subansiri in Arunachal Pradesh/Assam, built by NHPC — 1,250 MW (Units 1–5) already operational as of October 2026, with the remaining 750 MW still under construction.
Q10. What is the Koyna earthquake connection, and why does it matter for exams? A: The magnitude 6.6 Koyna earthquake of 10 December 1967 struck after the Koyna reservoir was filled; the dam survived. It links the plant to reservoir-induced seismicity — the standard exam fact about Koyna beyond its 1,960 MW.
Frequently Asked Questions
Q1. What is the largest hydroelectric power plant in India? Koyna, Maharashtra — 1,960 MW, the largest completed plant. The Tehri complex totals 2,400 MW (complete since April 2026), but its dam powerhouse is 1,000 MW; its pumped-storage plant was fully commissioned on 12 April 2026.
Q2. Which is the tallest dam in India? Tehri Dam, Uttarakhand — 260.5 metres, on the Bhagirathi. Bhakra (226 m) is second.
Q3. Which river is the Nathpa Jhakri plant on? The Sutlej, in Himachal Pradesh. It is India's largest underground hydroelectric plant at 1,500 MW.
Q4. What is the capacity of the Sardar Sarovar project? 1,450 MW — 1,200 MW river-bed plus 250 MW canal-head, on the Narmada in Gujarat.
Q5. How much of India's power capacity is hydro? Large hydro was 52,065 MW — about 9.3% of the 558,896 MW total on 30 September 2026 (CEA). Small hydro adds about 5,182 MW more.
Q6. Which state has the most large hydro plants in India? Himachal Pradesh — seven plants in the top 16 of this list, all on the Sutlej, Beas or Ravi.
Q7. Is Tehri 1,000 MW or 2,400 MW? Both, of different things: the Tehri Dam powerhouse is 1,000 MW; the Tehri complex (dam + 1,000 MW pumped storage + 400 MW Koteshwar) totals 2,400 MW.
Practice Next
- Thermal power: Thermal Power Plants in India: State-wise List, Largest, Capacity (2026)
- Nuclear power: Nuclear Power Plants in India: Complete List of 7 Sites, Capacity, Largest, Oldest (2026)
- Solar parks: Solar Parks in India: Complete List with Capacity, State and Operator (2026)
- River valley projects: Major River Valley Projects of India: Complete List with River, State and Purpose
- National parks: Total National Parks in India 2026: State-Wise List
- More free notes: All Study Notes
Sources: Capacities — Koyna 1,960 MW, Nathpa Jhakri 1,500 MW (SJVN/NHPC), Bhakra Nangal 1,325 MW, Sardar Sarovar 1,450 MW, Srisailam 1,670 MW (CEA/NHPC compilations; Tutorialspoint; NS Energy Business; ResearchGate seven-dams table — Srisailam 1,670, Nathpa Jhakri 1,500, Sardar Sarovar 1,450, Bhakra 1,325); Tehri Dam powerhouse 1,000 MW, complex 2,400 MW (1,000 MW dam + 1,000 MW pumped storage + 400 MW Koteshwar), tallest dam 260.5 m (NS Energy Business; CEA); Tehri PSP fully commissioned 12 April 2026 — Unit 1 on 7 June 2025, Unit 2 on 10 July 2025, Unit 3 on 12 December 2025, Unit 4 on 12 April 2026 (THDC India Ltd; NTPC disclosure 11 Apr 2026; Power Line 13 Apr 2026); capacity mix 30 September 2026 — total 558,896 MW, thermal 250,870 MW (44.9%), large hydro 52,065 MW (9.3%), nuclear 8,780 MW, renewables 247,182 MW (CEA via LotusArise/GK Insights); small hydro 5,182 MW (CEA); India 5th in the world for installed hydro capacity (CEA via LotusArise); operational pumped storage 7.43 GW across 10 projects, August 2026 (PIB via NextIAS); Subansiri Lower partly commissioned — Units 1–5 (1,250 MW) in commercial operation by 23 October 2026 (Unit 2 COD 23 Dec 2025; Unit 3 COD 1 Feb 2026; Unit 1 COD 20 Mar 2026; Unit 4 COD 8 May 2026; Unit 5 COD 23 Oct 2026), remaining 750 MW scheduled Q1 FY2027-28 (NHPC; NHPC investor presentation Nov 2026; Rajya Sabha USQ 2701, 16 Mar 2026; PIB Unit-2 commercial operation, Dec 2025). As of 17 November 2026.