Home/Notes/ISRO Missions List: Chandrayaan, Gaganyaan, Aditya-L1 and Upcoming Missions (2026)
ISRO Missions List: Chandrayaan, Gaganyaan, Aditya-L1 and Upcoming Missions (2026)
📖 Study ArticleScience & TechnologySSC CGL / CHSL, IBPS & SBI PO / Clerk, RRB NTPC / Group D

ISRO Missions List: Chandrayaan, Gaganyaan, Aditya-L1 and Upcoming Missions (2026)

By Published: 4 November 2026Exam: SSC CGL / CHSL, IBPS & SBI PO / Clerk, RRB NTPC / Group D
#static-gk#science-technology#isro-missions#chandrayaan#gaganyaan#ssc-cgl#current-affairs#space

Exam

SSC CGL / CHSL, IBPS & SBI PO / Clerk, RRB NTPC / Group D

Subject

Science & Technology

Reading time

18 min · 11 sections

Published

4 November 2026

On this page
  1. 1ISRO Missions List: Quick Answer
  2. 2What Is ISRO? (The Basics)
  3. 3Latest ISRO News 2025–2026 (with Dates)
  4. 4ISRO Missions List: Complete Timeline (1975–2026)
  5. 5Upcoming ISRO Missions (Targets, Not Launch Dates)
  6. 6ISRO Missions: Records and Firsts
  7. 7Common Mistakes Students Make
  8. 8How to Remember ISRO Missions (Study Method)
  9. 9ISRO Missions MCQs with Answers
  10. 10ISRO Missions FAQs
  11. 11Practice Next

ISRO Missions List: Quick Answer

This page lists 25 landmark flights, from Aryabhata in 1975 to PSLV-C62 in January 2026 — every mission students are asked about, with the launch date, the rocket, what happened, and the "first" it set. Nine more missions are listed separately as upcoming targets, because none of them has flown yet. The newest flown success is NISAR (30 July 2025), the first joint ISRO–NASA Earth mission. The newest setback is PSLV-C62 (12 January 2026), which failed in its third stage. The most-watched next flight is Gaganyaan G1, the uncrewed test flight carrying the robot Vyommitra, targeted for the last quarter of 2026 but not yet flown as of 7 November 2026.

🔥 Key Exam Takeaway: Aryabhata = 1975 (first satellite, Soviet rocket). Rohini RS-1 = 1980 (first satellite on an Indian rocket). Chandrayaan-1 = 2008 (water on the Moon). Mangalyaan = 2013/2014 (Mars on the first attempt, ₹450 crore). Chandrayaan-3 = 23 August 2023 (first landing near the lunar south pole; 4th country to soft-land). Aditya-L1 = 2023/2024 (Sun observatory at L1). SpaDeX = January 2025 (docking; 4th country). NISAR = 30 July 2025. Gaganyaan crewed flight = targeted 2027, NOT yet flown.

Why do websites disagree about Gaganyaan and Chandrayaan-4 dates? Because ISRO's own targets have slipped more than once — G1 moved from early 2026 to the end of 2026, and Chandrayaan-4 is quoted as both 2027 and 2028. Any page that gives a fixed future date without the word "targeted" is probably out of date. This page is as of 7 November 2026, and every future item is labelled a target.

What Is ISRO? (The Basics)

ISRO is the Indian Space Research Organisation, India's national space agency, formed in 1969 and headquartered in Bengaluru. It launches from the Satish Dhawan Space Centre at Sriharikota in Andhra Pradesh, which has two launch pads today, with a third approved. Its three workhorse rockets are the PSLV (Polar Satellite Launch Vehicle, the reliable light-to-medium launcher), the GSLV (Geosynchronous Satellite Launch Vehicle, with an indigenous cryogenic upper stage) and the heavy-lift LVM3 (Launch Vehicle Mark 3, the rocket that carried Chandrayaan-2, Chandrayaan-3 and will carry Gaganyaan).

FactDetail
Full nameIndian Space Research Organisation (ISRO)
Formed1969 (succeeding INCOSPAR, set up in 1962)
HeadquartersBengaluru, Karnataka
Launch centreSatish Dhawan Space Centre (SDSC), Sriharikota, Andhra Pradesh
Chairman (2026)Dr V. Narayanan (took charge in January 2025)
100th Sriharikota launchGSLV-F15 / NVS-02, 29 January 2025
Motto in examsSpace technology for national development — communication, remote sensing, navigation, science

Latest ISRO News 2025–2026 (with Dates)

These are the developments most likely to be asked this year, because they are newer than most textbooks.

DateDevelopmentWhy it matters
12 January 2026PSLV-C62 / EOS-N1 failed — a disturbance in the third-stage (PS3) roll rates near the end of the burn pushed the rocket off its path; all 16 satellites (EOS-N1 plus 15 co-passengers) were lost.Second PSLV failure in a row, after PSLV-C61 in May 2025 — both third-stage anomalies.
24 October 2026ISRO Chairman V. Narayanan said Gaganyaan G1 would fly "in two months", pointing to late December 2026. No launch date has been announced.G1 is targeted for Q4 2026; as of 7 November 2026 it has not flown.
12 October 2026The two SpaDeX satellites re-entered the atmosphere, about seven hours apart, ending the mission after nearly 21 months.Closes the docking-demonstration mission that made India the 4th docking country.
23 August 20263rd National Space Day held at Ahmedabad, theme: "Towards Viksit Bharat: Innovating, Collaborating and Aspiring to Global Space Leadership".The day marks Chandrayaan-3's landing; 2026 was its third observance.
30 July 2025NISAR launched on GSLV-F16 — the first ISRO–NASA joint Earth-observation mission, costing over 1.5 billion US dollars.World's first dual-frequency (L-band + S-band) radar imaging satellite.
3 November 2026PIB/DST reported Aditya-L1's VELC instrument helped reconstruct a solar eruption (coronal mass ejection) in 3D.Aditya-L1 is producing published science, not just flying.

ISRO Missions List: Complete Timeline (1975–2026)

One chronological table. "Firsts" means firsts for India unless stated otherwise. Two rows — Rakesh Sharma (1984) and Axiom-4 (2025) — are Indian human-spaceflight milestones that were not ISRO launches; they are included because exams ask them alongside ISRO missions, and the vehicle column says so.

MissionLaunch dateVehicle / destinationOutcome / statusFirsts
Aryabhata19 April 1975Kosmos-3M (Soviet), from Kapustin YarIndia's first satellite; worked about 4 days (60 orbits) before a power failureFirst Indian satellite, named after the 5th-century astronomer
Bhaskara-I7 June 1979Interkosmos (Soviet)First experimental remote-sensing satellite (TV and microwave cameras)First Indian Earth-observation satellite
Rohini RS-118 July 1980SLV-3, from SriharikotaFirst satellite placed in orbit by an Indian-made rocketIndia joined the small group of countries able to orbit a satellite with its own launch vehicle
APPLE19 June 1981Ariane (European)First experimental communication satellite, three-axis stabilised in geostationary orbitFirst Indian communication satellite; APPLE = Ariane Passenger Payload Experiment
INSAT-1B30 August 1983Space Shuttle Challenger (STS-8)Deployed from the Shuttle and boosted to geostationary orbit; worked for yearsFirst fully operational INSAT (INSAT-1A, April 1982, failed within months)
Rakesh Sharma — Soyuz T-113 April 1984Soyuz (Soviet), to Salyut-7First Indian in space; 7 days 21 hours in orbit; famous "Saare Jahan Se Achcha" replyFirst Indian in space (Indo-Soviet flight, not an ISRO launch)
IRS-1A17 March 1988Vostok (Soviet), from BaikonurFirst operational remote-sensing satellite; worked far beyond its 3-year design lifeStart of the IRS series, India's resource-mapping system
PSLV-D1 / IRS-1E20 September 1993PSLV, first developmental flightFailed — guidance problem; IRS-1E never reached orbit. PSLV-D2 succeeded in October 1994.First PSLV flight (a failure students forget)
Chandrayaan-122 October 2008PSLV-C11, to the MoonOrbiter + Moon Impact Probe (impacted 14 November 2008); contact lost 29 August 2009 after most objectives were metFirst Indian lunar mission; confirmed water molecules on the Moon (NASA's M3 instrument)
IRNSS-1A1 July 2013PSLV-C22First satellite of the Indian Regional Navigation Satellite System, now called NavICFirst Indian navigation satellite (7-satellite constellation)
Mars Orbiter Mission (Mangalyaan)5 November 2013PSLV-C25, to MarsEntered Mars orbit on 24 September 2014; worked for 8 years (designed for 6 months)First Asian nation to reach Mars; first country to succeed on the maiden attempt; cheapest Mars mission (₹450 crore)
GSLV-D5 / GSAT-145 January 2014GSLV Mk IIFirst successful flight of the indigenous cryogenic upper stageIndia became the sixth space agency with an indigenous cryogenic engine
AstroSat28 September 2015PSLV-C30India's first space observatory; 5 payloads watching X-ray, ultraviolet and optical light togetherFirst dedicated Indian astronomy mission
GSLV Mk III-D1 / GSAT-195 June 2017GSLV Mk III (now LVM3), first orbital flight3,136 kg GSAT-19 placed in orbit; the heavy-lift rocket proved itselfFirst orbital flight of the LVM3 family that later flew Chandrayaan and Gaganyaan
Chandrayaan-222 July 2019LVM3-M1, to the MoonVikram lander crashed on 6 September 2019 (software glitch); the orbiter is still working and relayed Chandrayaan-3First Indian attempt at a soft lunar landing; crash site named Tiranga Point
Chandrayaan-314 July 2023LVM3-M4, to the MoonVikram landed 23 August 2023 at about 69°S; Pragyan rover travelled over 100 metres for one lunar dayFirst country to land near the lunar south pole; 4th country to soft-land on the Moon; landing site named Shiv Shakti Point
Aditya-L12 September 2023PSLV-C57, to Sun–Earth L1Entered a halo orbit around Lagrange Point L1 on 6 January 2024, about 1.5 million km from EarthIndia's first space-based solar observatory (7 payloads)
TV-D121 October 2023Test Vehicle, suborbitalCrew Escape System test: capsule pulled away at Mach 1.2, splashed down in the Bay of Bengal and was recovered by the NavyFirst Gaganyaan abort test
XPoSat1 January 2024PSLV-C58X-ray polarimetry observatory studying black holes, neutron stars and pulsarsIndia's first dedicated X-ray polarimetry mission
SpaDeX30 December 2024PSLV-C60, two satellites (SDX01, SDX02)Docking achieved 16 January 2025 (third attempt); undocking 13 March 2025; second docking 20 April 20254th country to master space docking, after the US, Russia and China
GSLV-F15 / NVS-0229 January 2025GSLV-F15NVS-02 (NavIC, second generation) placed in transfer orbit100th launch from Sriharikota; first launch under Chairman V. Narayanan
PSLV-C61 / EOS-0918 May 2025PSLVFailed — third-stage anomaly (pressure drop); EOS-09 lostFirst PSLV failure of the current sequence
Axiom Mission 425 June 2025Falcon 9 / Dragon (Axiom Space, NASA)Group Captain Shubhanshu Shukla spent 18 days on the ISS, ran 7 ISRO experiments, splashed down 15 July 2025First Indian on the International Space Station; second Indian in space (not an ISRO launch)
NISAR30 July 2025GSLV-F162,393 kg satellite in a 747 km Sun-synchronous orbit; first GSLV flight to such an orbitFirst ISRO–NASA joint Earth mission; world's first dual-frequency radar satellite
PSLV-C62 / EOS-N112 January 2026PSLVFailed — third-stage roll-rate disturbance near the end of the burn; all 16 satellites lostSecond consecutive PSLV third-stage failure

Upcoming ISRO Missions (Targets, Not Launch Dates)

Every date in this section is a target announced by ISRO or the government. Targets slip — Gaganyaan G1 alone has slipped from early 2026 to late 2026. Never write these years in an exam answer without the word "targeted".

MissionTargetWhat it isStatus as of 7 November 2026
Gaganyaan G1Q4 2026First uncrewed orbital test flight, carrying the half-humanoid robot Vyommitra, on the human-rated LVM3Not flown; chairman said "in two months" on 24 October 2026
Gaganyaan crewed flight (H1)20273 astronauts to about 400 km orbit for up to 3 days, after further uncrewed testsNo firm date; would make India the 4th country with independent human spaceflight
Chandrayaan-42027 or 2028 — sources differ; state bothLunar sample-return: two LVM3 launches, docking in lunar orbit, a few kilograms of south-pole soil brought home; ₹2,104.06 crore approved September 2024Landing-site studies under way
LUPEX / Chandrayaan-52028–29ISRO–JAXA mission to the lunar south pole; JAXA rover hunting water ice; about 100 days of surface lifeNo launch date fixed
Venus Orbiter Mission (Shukrayaan)March 2028 (launch window)Orbiter to study Venus's surface and thick, acidic atmosphere; ₹1,236 crore approved September 2024In development
TRISHNALate 2027 (October 2027–February 2028 window)ISRO–CNES thermal-infrared Earth-observation satellite for water, farming and climate; 761 km orbit, 5-year lifeAdvanced stage of realisation, per ISRO, October 2026
Bharatiya Antariksh Station — BAS-1First module 2028; full 5-module, 52-tonne station 2035India's own space station at about 400 km; first module approved September 2024 (₹1,763 crore)Under design
Crewed Moon landing2040An Indian landing on the Moon and safe return, under the Prime Minister's guidelineLong-term goal
Third launch pad, SriharikotaApprovedA new pad for all vehicles including the Next Generation Launch Vehicle (NGLV); about ₹4,000 croreApproved; ISRO today relies on two pads

ISRO Missions: Records and Firsts

RecordAnswer
First Indian satelliteAryabhata (1975) — launched by a Soviet rocket
First satellite on an Indian rocketRohini RS-1 (1980) — SLV-3
First Indian in spaceRakesh Sharma (1984) — Soyuz T-11
First Indian on the ISSShubhanshu Shukla (2025) — Axiom-4
First lunar missionChandrayaan-1 (2008) — found water molecules
First Mars missionMangalyaan (2013/2014) — first attempt, ₹450 crore
First south-pole Moon landing (world)Chandrayaan-3 (2023)
First solar observatoryAditya-L1 (2023/2024)
First docking (4th country)SpaDeX (2025)
First ISRO–NASA joint missionNISAR (2025)
Cheapest Mars missionMangalyaan, ₹450 crore — about a tenth of NASA's MAVEN
100th Sriharikota launchGSLV-F15 / NVS-02 (2025)
Most recent failurePSLV-C62 (January 2026) — third stage

One-line facts that are asked in exams

  • Chandrayaan-1's Moon Impact Probe hit near Shackleton crater on 14 November 2008; the spot is called Jawahar Point.
  • Chandrayaan-3's landing site is Shiv Shakti Point; Chandrayaan-2's crash site is Tiranga Point.
  • Pragyan means "wisdom" in Sanskrit; the rover weighed about 26 kg and was built to travel up to 500 metres.
  • Vikram (both landers) is named after Dr Vikram Sarabhai, the father of the Indian space programme.
  • Vyommitra is a half-humanoid robot (head, arms, upper body, no legs) that will fly on Gaganyaan's uncrewed test flights before any astronaut does.
  • L1 is a Lagrange point about 1.5 million km from Earth towards the Sun, where Aditya-L1 can watch the Sun without interruption.
  • NavIC (Navigation with Indian Constellation) is India's own regional navigation system, built from the IRNSS satellites plus the NVS series.
  • NISAR carries two radars — NASA's L-band and ISRO's S-band — and can see through clouds, day and night.

Common Mistakes Students Make

  • Aryabhata was not launched by an Indian rocket. It went up on a Soviet Kosmos-3M. Rohini RS-1 (1980) was the first satellite on an Indian-made rocket.
  • Chandrayaan-2 was not a total failure. The Vikram lander crashed, but the orbiter worked — and is still working. Say "lander failed, orbiter succeeded".
  • Chandrayaan-3 was not the first Moon landing. It was the first landing near the south pole, and India was the 4th country to soft-land, after the US, the Soviet Union and China.
  • No Indian has flown on an ISRO rocket yet. Rakesh Sharma flew Soviet (1984) and Shubhanshu Shukla flew American (2025). Gaganyaan's crewed flight is still a target for 2027.
  • Aditya-L1 did not land on the Sun. It orbits the L1 point, 1.5 million km from Earth, and observes the Sun from there.
  • PSLV does fail sometimes. Two in a row failed — PSLV-C61 (May 2025) and PSLV-C62 (January 2026) — both in the third stage. Do not call PSLV "100% reliable".
  • NISAR is an Earth mission, not a Moon mission. It watches Earth's surface, glaciers, forests and earthquakes from a 747 km orbit.
  • "Gaganyaan 2026" on old pages is stale. The crewed flight was once talked about for 2026; the current official target is 2027, and even that has no firm date.

How to Remember ISRO Missions (Study Method)

  1. Learn the decade spine first: 1975 Aryabhata → 1980 Rohini → 2008 Moon water → 2013 Mars → 2019 crash → 2023 Moon landing → 2024 Sun → 2025 docking and NISAR → 2026 PSLV failure.
  2. Learn the "four firsts" as a set: first satellite (Aryabhata), first Indian rocket success (Rohini), first Moon water (Chandrayaan-1), first Mars attempt (Mangalyaan).
  3. Learn the two failure pairs: PSLV-D1 (1993) failed at the start of the PSLV story; PSLV-C61 and C62 (2025–26) failed at the end of it — both times, the third stage.
  4. Learn the 2023–2025 run as one story: Chandrayaan-3 lands (Aug 2023) → Aditya-L1 reaches L1 (Jan 2024) → SpaDeX docks (Jan 2025) → NISAR flies (Jul 2025). Four missions, three years, four different destinations.
  5. For the pipeline, learn targets with the word "targeted" attached: G1 (2026), crewed (2027), Chandrayaan-4 (2027/2028), Venus (March 2028), station (2035), Moon landing (2040).

ISRO Missions MCQs with Answers

Q1. India's first satellite, Aryabhata, was launched in: (a) 1969 (b) 1975 (c) 1980 (d) 1983 Answer: (b) 1975, on a Soviet Kosmos-3M rocket from Kapustin Yar.

Q2. The first satellite placed in orbit by an Indian-made launch vehicle was: (a) Aryabhata (b) Bhaskara-I (c) Rohini RS-1 (d) APPLE Answer: (c) Rohini RS-1, on SLV-3 on 18 July 1980.

Q3. Water molecules on the Moon were confirmed using data from which instrument on Chandrayaan-1? (a) CHACE (b) Moon Mineralogy Mapper (M3) (c) VELC (d) POLIX Answer: (b) Moon Mineralogy Mapper (M3), a NASA instrument aboard Chandrayaan-1.

Q4. Mangalyaan entered Mars orbit on 24 September 2014. What was its approximate cost? (a) ₹45 crore (b) ₹450 crore (c) ₹4,500 crore (d) ₹45,000 crore Answer: (b) ₹450 crore, making it the cheapest Mars mission ever flown.

Q5. Chandrayaan-3's Vikram lander touched down on: (a) 14 July 2023 (b) 23 August 2023 (c) 6 September 2019 (d) 22 October 2008 Answer: (b) 23 August 2023, near the lunar south pole. The date is now National Space Day.

Q6. Aditya-L1 observes the Sun from a halo orbit around L1, about how far from Earth? (a) 1.5 lakh km (b) 3.84 lakh km (c) 1.5 million km (d) 150 million km Answer: (c) 1.5 million km, towards the Sun. (3.84 lakh km is the Moon's distance.)

Q7. With SpaDeX's docking on 16 January 2025, India became the ___ country to master space docking. (a) Second (b) Third (c) Fourth (d) Fifth Answer: (c) Fourth, after the United States, Russia and China.

Q8. NISAR, launched on 30 July 2025, is a joint mission of ISRO and: (a) ESA (b) JAXA (c) NASA (d) CNES Answer: (c) NASA. It was launched on GSLV-F16 and is the world's first dual-frequency radar satellite.

Q9. The PSLV-C62 / EOS-N1 mission of 12 January 2026 failed because of an anomaly in the: (a) First stage (b) Second stage (c) Third stage (d) Fourth stage Answer: (c) Third stage — a roll-rate disturbance near the end of the PS3 burn. PSLV-C61 failed in the same stage in May 2025.

Q10. Vyommitra, who will fly on Gaganyaan's uncrewed test flight G1, is: (a) India's first astronaut (b) A half-humanoid robot (c) A recovery ship (d) A new rocket Answer: (b) A half-humanoid robot, built to test the crew module's systems before astronauts fly.

ISRO Missions FAQs

How many ISRO missions are listed on this page?

25 landmark flights from 1975 to 2026, plus 9 upcoming missions listed separately as targets. The count covers the missions exams ask about, not every satellite ISRO has ever launched — the 100th Sriharikota launch was in January 2025, and more have flown since.

When was ISRO founded?

In 1969, succeeding INCOSPAR (set up in 1962). Its headquarters are in Bengaluru and it launches from Sriharikota in Andhra Pradesh.

Has India sent humans to space on its own rocket?

Not yet. Rakesh Sharma flew on a Soviet Soyuz in 1984 and Shubhanshu Shukla flew on an American Axiom/SpaceX mission in 2025. India's own crewed flight, Gaganyaan, is targeted for 2027.

What is the status of Gaganyaan G1?

Targeted for the fourth quarter of 2026, carrying the robot Vyommitra and no crew. As of 7 November 2026 it has not flown and no launch date has been announced; the ISRO Chairman said on 24 October 2026 that it was about two months away.

What is NISAR and why is it special?

The NASA–ISRO Synthetic Aperture Radar satellite, launched 30 July 2025 on GSLV-F16. It is the first joint ISRO–NASA Earth-observation mission and the world's first satellite carrying two radar frequencies (L-band and S-band), watching Earth's surface, ice, forests and earthquakes through cloud, day and night.

Why is National Space Day on 23 August?

It marks the soft landing of Chandrayaan-3's Vikram lander near the lunar south pole on 23 August 2023. The first observance was in 2024; 2026 was the third, held at Ahmedabad.

Which ISRO missions failed recently?

PSLV-C61 (EOS-09, 18 May 2025) and PSLV-C62 (EOS-N1, 12 January 2026) — both lost to third-stage anomalies. Earlier failures students should know: PSLV-D1 (1993) and the Chandrayaan-2 lander crash (2019), whose orbiter still works.

Related topics: revise Important Days List 2026 (National Space Day, 23 August), Nuclear Power Plants in India List (another technology list in the same format), First in India List (Rakesh Sharma and other firsts), Physics for RRB Group D and Science Numericals for RRB ALP and JE next.

Practice Next

Sources: ISRO (isro.gov.in) mission pages and chairman's statements; PIB press releases (Department of Space, DST) of 2024–2026; NASA Science (Chandrayaan-1, STS-8); ISRO monthly summary, January 2025 (100th launch); CNES TRISHNA mission page; Lok Sabha / Rajya Sabha replies on Gaganyaan, BAS and TRISHNA (2026). Pipeline dates are targets as announced, not confirmed launches. As of 7 November 2026.

Test Your Knowledge

Take a free mock test for SSC CGL / CHSL, IBPS & SBI PO / Clerk, RRB NTPC / Group D right now.

Take Free Mock Test →